Multi-stage simultaneous lot-sizing and scheduling

Planning of Flow Lines with Shifting Bottlenecks

Parametri

  • 208pagine
  • 8 ore di lettura

Maggiori informazioni sul libro

Due to a varying product demand (changing product mix) and different production speeds, bottlenecks may shift between the stages. In that case, a simultaneous lot-sizing and scheduling of these stages is recommendable. Hence, an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) was developed. Moreover, several reformulation techniques were applied to this model to solve it exactly. Besides, a new meta-heuristic which combines the principles of Variable Neighborhood Decomposition Search (VNDS) and Exchange was implemented to find good solutions, even for a real-world problem case. Finally, further model extensions, e. g., for scarce setup resources, were proposed.

Acquisto del libro

Multi-stage simultaneous lot-sizing and scheduling, Florian Seeanner

Lingua
Pubblicato
2013
product-detail.submit-box.info.binding
(In brossura)
Ti avviseremo via email non appena lo rintracceremo.

Metodi di pagamento